We have a solid reputation for undertaking educational, healthcare, community facilities, industrial, retail and refurbishment projects for both public and private sector clients. We can operate under traditional contract, on a 'Design and Build' basis or as works packages on major schemes and under local and central government framework contracts. Working within the education sector requires a specialist and sensitive approach to the bespoke nature of every individual project. Walker Construction meticulously plan and strictly control the highest standards of health and safety on these sites which can range from primary schools to special needs schools and young offenders institutions.
St John's Primary School
St John’s Primary School project was a £1.2M refurbishment scheme. Encompassing the underpinning, Helifix, renovation, refurbishment and retrofitting to an old 1800’s school; including asbestos removal and mechanical & electrical re-design and improving the schools thermos efficiency.
View Case StudyBishop Justus
We have completed the works on a £3.6 million project at Bishop Justus C of E School in Bromley, which comprised of the complete design, construction and completion of a series of one and two storey extensions, plus localised works to the existing building and construction of a small car park.
View Case StudyHilton Dentistry
Works to the dentist surgery consisted of the reconfiguration of the internal building, refurbishment throughout the practice and the conversion of the first floor of the premises to incorporate three new dental surgery rooms, a conference room and two upgraded restroom facilities with generous disabled access incorporated throughout.
View Case StudyRochester Fire Station
Walker Construction (leaguecommittee.com) Ltd were awarded the contract to build two new Fire and Rescue Stations at Rochester and Medway, the new Fire Station at Rochester is situated on a new site next to Rochester airport, the station also features a new state of the art Road Safety Centre attached to the station for training and educating the general public and schools, as well as a purpose built steel training tower building for Fire Officer training.
View Case StudyNorman Tailyour House
A major £2.5m redevelopment has been completed at Norman Tailyour House in central Deal. The project was to renovate the residential facility to provide 18 fully self-contained sheltered residential Council flats to Dover District Council. The renovated Council-owned building in Hope Road, Deal, includes 16 one-bedroom flats and 2 two-bedroom flats in a supported housing environment.
View Case StudyWith over 50 years of experience in delivering infrastructure projects for local/central government and developers we can provide a complete construction package, especially suited to Section 106 & 278 works agreements. We can provide a 'Design and Build' service focusing on added value, innovation engineering, utilising up-to-date techniques to minimise waste and reduce costs. We have the ability to respond to any situation using our own directly employed, multi-skilled workforce supported by experienced, robust project management and planning skills.
Flanchford Bridge
The beginning of this project consisted of the temporary damming of the River Mole to enable the existing bridge to be removed. We had to temporarily divert the utility services across the river using a scaffold bridge. Temporary foundations either side of the river were then created to support the heavy plant required to install the sheet piles and CFA Piles.
View Case StudyNicholls Transport Yard
Nicholls Transport is based in Kent and provides tailor-made haulage operations for blue chip clients throughout the leaguecommittee.com, Northern France, Belgium and The Netherlands. Nicholls Transport contacted Walker Construction to assist them with their vision of a new, state of the art logistics park.
View Case StudyWalker Construction provides a wide range of civil, building, mechanical and electrical services across the rail network. Our experienced Rail Division have successfully delivered schemes in what is commonly know as a 'challenging environment' focusing on safe, timely delivery in line with the clients operational and quality aspirations whilst minimising the impact on the live infrastructure. We have the ability to deliver a wide range of integrated and sustainable solutions for our clients who include Network Rail, HS1, train operating companies and multi-ntional contractors within the rail industry.
Dalston Kingsland Booking Hall
Walker Construction was employed to carry out refurbishment works at Dalston Kingsland Overground Station. The existing booking hall at the station was constructed in the 1980’s. It was decided due to increased usage of the Overground network the existing booking hall and gateline was insufficient to handle the passenger flow at peak times. To the immediate left of station was an existing disused retail unit that was to be incorporated into the station booking wall.
View Case StudyBlacksole Footbridge
This project was to complete a Design & Build contract for the construction of a new 52 metre pedestrian/cycleway bridge. This included associated works of footpaths and lighting to provide access to the new Altira Business Park in Herne Bay, Kent in collaboration with NuSteel Structures, WSS Construction Consultants (our internal Design Division), Urban & Civic and Kent County Council.
View Case StudySpalding Railway Station
May 2020 Walkers were instructed by Amco to undertake Platform Re-gauging works and Platform surfacing with block paving. Other works combined with the surfacing was the installation of new Aco drainage with a large capacity water soakaway system to the rear of the Platform.